• Village community swimming pool
• Community center with kitchen and meeting room
• Lighted waterside boardwalk
• Fishing docks
• Boat docking areas
• Short walk to beach access
• Decorative landscaped fence at entrance
• Upgraded and distinguished landscaping
• Boat access to gulf
• Generous up-lighting in landscaped areas
• Heated pool
• Handicap Accesible Hydralic Elevators
• A true village setting
• Windows w/impact resistant insulated glass
• Stucco first level
• Hardi-plank second to fourth levels
• Weather-resistant entry doors & frames
• Architectural elevation accents
• Conveniently-located elevators
• ADA “unit” on each floor
• Decorative standing seam metal roof
• Private balconies/porches
• Quality exterior and interior paint
• 50-gallon hot water heater
• Fire suppression sprinkler system in each unit
• 40 oz carpet with 6 lb pad, your choice of selected colors
• 9-foot ceilings in living room
• Ceramic tile in entry, hall, bathrooms, utility room and kitchen
• Ceiling fans in living and bedroom areas
• Smoke detectors in bedrooms & kitchen
• Quality cabinets with raised panel or trim
• Under mount stainless steel kitchen sink
• Whirlpool (or equivalent) white appliances
• Dishwasher, disposal, 20 cu. ft. refrigerator w/ice maker
• Full-size Whirlpool (or equivalent) stacked washer/dryer
• Solid surface kitchen countertops
• Open floor plan from kitchen
• Microwave and self-cleaning oven
|
MASTER BEDROOM/BATH SUITE |
• Cultured marble countertops with integral bowl
• Deluxe Delta lavatory faucets
• Garden tub with deluxe Delta deck valves
• Private balcony from master suite
• Generous walk-in closet space
|
|
 |
|
| DECEMBER 2006 |
December 20, 2006
+ The project is 72% complete and we anticipate final completion in the spring of ’07.
|
|
| Click on thumbnails to view larger photos. |
|
| NOVEMBER 2006 |
November 17, 2006
+ Construction progress is moving along at a rapid pace. On building “A”
Roof Trusses have been installed and metal roofing is 99% complete. Metal studs and drywall are complete in building and finish crews have started on the fourth floor. Exterior building wrap is complete and crews have started installing trim and siding. On Building “B” roofing crews are starting eave drip and valley metal and should have roofing panels installed by 12/30/06. Metal studs and drywall are ongoing. Exterior wrap is currently being installed with trim and siding to follow.
Swimming Pool – a new larger swimming pool and deck area has been designed, construction will begin in late November.
|
|
| Click on thumbnails to view larger photos. |
|
| SEPTEMBER 2006 |
September 25, 2006
+ Construction on the condominiums continue as work crews finish installing the roof on each building. Both buildings should be dried-in within the next 30 days. Additional crews are also installing sheating on exterior walls to prepare for exterior finishes. Interior wall studs, mechanical, electrical and plumbing are currently ongoing. The estimated completion date is set for early spring 2007.
|
|
| Click on thumbnails to view larger photos. |
|
| JUNE 2006 |
June 30, 2006
+ The Waterside condos construction is running smoothly and currently on schedule. Within the next 2 to 3 weeks each buyer will be sent an interior finish selection package.
Within the next two weeks, the fourth floor slabs on both buildings will be poured. Once these slabs are poured the work crews will begin preparing to set roof trusses.
The boardwalks are seventy percent complete.
The current completion date of these units is January 2007. (“This date is subject to change”)
|
|
| Click on thumbnails to view larger photos. |
|
June 9, 2006
+ This is a view from the condo site looking west to east down the canal. As you can see, all the boardwalks and docks are in place and are currently being stained and painted.
|
|
| Click on thumbnails to view larger photos. |
|
| MAY 2006 |
May 5, 2006
+ This aerial view of Waterside Village shows the waterway connecting the village to the beach.
|
|
| Click on thumbnails to view larger photos. |
|
May 5, 2006
+ This east to west view shows the rear entrance walkovers leading to the boardwalk and docks. In the background you can see the framework of the condominium units in progress.
|
|
| Click on thumbnails to view larger photos. |
|
| FEBRUARY 2006 |
February 17, 2006
+ All grade beams are complete, interior fill is complete. Underground plumbing, electrical, HVAC is ongoing. First floor slabs will start to be poured by the end of the month. This project is scheduled to be complete by November 30th 2006.
The first floor slab on the 16 unit building was poured on 2/17/06. The first floor slab on the 35 unit building is scheduled to be poured next week.
|
|
| Click on thumbnails to view larger photos. |
|
| DECEMBER 2005 |
December 21, 2005
+ The foundation work and the piles on the Condo buildings are going smoothly and on schedule as planned.
|
|
| Click on thumbnails to view larger photos. |
|
| SEPTEMBER 2005 |
September 1, 2005
+ Construction on the condos starts Monday, September 5th, 2005.
Construction will take approximately 12 to 14 months.
Updates will be added as construction progresses.
|
|